SnoClips™ can be added to the assembly using a mallet, pliers, or Channel-Locks. One, two or three clips are used between seams depending upon seam spacing and system design. SnoClip has three locks available for use depending upon seam height. Mount the SnoClip to the lower rod using the lock that results with the rubber "foot" resting properly on the panel surface. When applying downward pressure on the part, the "toe" should engage the surface of the panel just before the "heel".