| Next |
SnoRail™SnoFence&trade Installation
Use a string line across the top of the panels at the desired location.
|
First, use a string line across the top of the panel seams at the desired location to establish a true line for installation of the S-5!® clamps. Individually measuring each clamp location from the eave is not recommended. When installing clamps on roof panels which utilize a two-piece panel attachment clip, or on double folded standing seam profiles which use a "fixed clip", the clamp may be installed at a clip location if desired. In the case of other system profiles utilizing a one-piece clip, the clip locations should be avoided.
| Next |



