| Next |
String a line at clamp location.
|
To check the integrity of your design, or to assist you and your distributor in developing a design, try our ColorGard® calculator.
You may also want to download and print complete documentation on installing the ColorGard® system, by clicking here.
ColorGard® is easy to install.
First, at the desired location, use a string line across the top of the panel seams - this will establish a true line for installation of the S-5!™ clamps. Individually measuring each clamp location from the eave is not recommended.
When installing clamps on roof panels which utilize a two-piece panel attachment clip, the clamp may be installed at a clip location if desired. When the panel system utilizes a one-piece clip, installing at clip locations should be avoided.
| Next |



